INS11253 - Prepare and issue statutory demand


Process checks: Prepare and issue statutory demand

The Band E1 Assistant Examiner will

  • Check and input interest repairs and enter (pseudo) SA on to IDMS.
  • Create the draft statutory demand on IDMS

but when an IDMS produced statutory demand is not possible will

  • Create a ‘WORD’ statutory demand ( INS11255) and then
  • Reconcile the amounts against till roll or Excel (for ‘WORD’ statutory demand).
  • Print the draft statutory demand.
  • Check the draft statutory demand and remedies any errors.

The Band D Examiner (C2 for unauthorised Examiner) will then

  • Check the draft statutory demand against the factsheet and systems (Referring the case back to the E1 to remedy any errors or resolve queries).
  • Sign the Board’s order for bankruptcy proceedings, if the case is satisfactory for proceedings and the statutory demand is correct.

The Band E2 Registrar will then

  • Print four copies of the statutory demand for issue
  • Prepare forms SOL 420 (two copies) and SOL 416 (W/S) (E2).

If the statutory demand is to be served by process server, will complete form 80-EO(1) on LFC, and attach the completed 17/EO only.

  • Note
  • The IDMS and SA systems
  • MELT
  • Team statistics.
  • And then send the statutory demand for service to the
  • Collector: forms SOL 420, SOL 416 (W/S) (E2) with copies of forms 225-1, 32C/EO and IDMS300 (or 17/EO if the IDMS300 is out of date or unavailable.
  • Process server(This text has been withheld because of exemptions in the Freedom of Information Act 2000)forms 80-EO(1) (prepared on LFC) and attaches completed 17/EO only.
  • BF the case for eight weeks (overriding the automatic IDMS six-week BF) to the E2 (under their initials) to telephone and follow up service
  • On IDMS show the Next Action as ‘Mon Aff Service’.