A limited contingency is in place to assist contractors where
their computer software was not ready for the implementation of the
Construction Industry Scheme from 6th April 2007. This should only
affect a small minority of contractors who previously used impact
printers and instructions for such contractors will be given. This
area of work will not be received through PEGA.
Contractors who contacted the CIS Helpline to advise their
computer software was not ready for CIS were advised of the
alternative methods of submitting returns. These are
Where the contractor insists they cannot submit their returns by either method they will be able to obtain Printer Friendly Continuation Sheets (PFCS). The CIS Helpline will set a signal to restrict the issue of pre-populated returns for a maximum period of 3 months. PFCS will be issued for each period for a maximum of 3 months. Each period will have
When the PFCS signal has expired, pre-populated returns will be recommenced. Where the contractor’s computer software is still not ready for CIS, they will need to phone the CIS Helpline again to request a further supply of PFCS. The CIS Centre will receive the PFCS directly as the envelope used by the contractor will have the CIS Centre address on it. There should be no need for any PFCS after 6th April 2009.
On opening the envelope you should check the contents to ensure
Where the declaration has not been signed you should
Where any of the PFCS or declarations are not on official HMRC stationary, or include any photocopies, you should
Where the contents of the envelope are on official HMRC stationary and the declaration has been signed
From the ‘Identify Customer’ window
If the UTR or AO Ref is not entered or is entered incorrectly an ‘Unmatched Return’ work item will be created.
The ‘CIS Main Menu’ window will then be displayed,
The ‘Return Details’ window will be displayed and you should
Where an incorrect or invalid return month is entered an error message will be displayed telling you to check the return month you have entered. You should
If, when logging and capturing a return, you see the warning message ‘Previous return captured’, you should check the scheme reference and the month before continuing as this message indicates that a return has already been captured for the same scheme and return month. You should only select
If you are not content with the details you have entered select
The ‘Return Details’ window will be displayed, you should then select
If the subcontractor is listed
If there are greater than 300 entries on the drop down menu, only the first 300 will be shown. If the entry is not on the list, you should
Where there are no entries in any of the payment columns this
means that no payments have been made to that subcontractor for
that month and no entry is needed. The added subcontractor details
will appear under the Payment Details heading at the bottom of the
window. You should follow the above process for each of the
subcontractors on the PFCS for that same return and month.
Note: All entries must be keyed-in exactly as they
appear on the return.
Once all entries on the return have been captured
The ‘Confirmation Details’ window will then be displayed and you should complete the appropriate check boxes as follows
If the Subcontractor employment status and Subcontractor
verification boxes have not been ticked by the contractor, the CIS
system will capture this point and report it as a compliance
failure automatically and there is no further action for the CIS
Centre to take. You will be presented with an error message and
prevented from completing capture, if you try to continue without
checking any of the above boxes.
The Contact Name and Contact Telephone number fields will be
pre-populated if CIS holds these details. You should then
The PFCS will now have been logged and captured.
If the subcontractor details are not listed, you should enter the following details from the PFCS under the ‘Subcontractor Details’ heading
You should then
The added subcontractor details will appear under the Payment
Details heading at the bottom of the window. You should follow the
above process for each of the subcontractors on the PFCS for that
same return and month.
Note: All entries must be keyed in exactly as they
appear on the return.
Once all entries have been captured
The PFCS will now have been logged and captured.
You can save a partially captured PFCS at any stage of the capture process. At any point when entering subcontractor details prior to selecting ‘OK’ you should
From the ‘Identify Customer’ window you should
The ‘CIS Main Menu’ window will be displayed and you should select
The ‘Return Details’ window will be displayed and you should
The ‘Other Return Exists’ window will be displayed and a message will be shown as ‘A return for this period has already been logged/partially captured’. In this case, you should
You will now see the window where ‘Save Partial’ was selected and should
From the ‘Subcontractor Details and Payment Details’ window, you should
The subcontractor details will then have been removed.
From the ‘Subcontractor Details and Payment Details’ window, you should
You will now see that the details for the subcontractor populate the boxes on the right of the window. You should now
The altered subcontractor details will be added under the Payment Details heading at the bottom of the window.
Where characters on a PFCS are unreadable, you should take the following action dependent on the field that cannot be read
Printer Friendly Returns and their respective continuations sheets need to be stored for a total of 7 years on a rolling basis. They should be stored in MM/YY order.