Construction Industry Scheme - CIS8100
Scheme compliance: EHU reports: introduction
| CIS0040 | Back to `Scheme compliance' contents
|
| CIS8101 | Information menu
|
| CIS8102 | Action guides menu
|
EHU REPORTS: INTRODUCTION
This paragraph is an overview of the module on handling
exception reports arising from the processing of CIS vouchers
submitted under the Construction Industry Scheme. For more in-depth
coverage use the above links to the information menu or action
guide menu.
The module provides a description of exception reports
arising from voucher processing problems and outlines the
arrangements for distributing the reports to various Revenue
offices for action, including Network Offices. It also gives
guidance on how exception reports directed to Network Offices
should be dealt with.
EXCEPTION REPORTS
An exception report is a report of a system error or processing problem encountered at the CIS Centre or on the CIS system. The exception reports covered in this module are those relating to voucher processing. Other exception reports are dealt with in the module on exception reports at CIS4800.
EXCEPTION HANDLING UNIT (EHU)
The Exception Handling Unit is a special unit set up to review
exception reports generated by voucher processing problems at the
CIS Centre. The EHU evaluates all reports.
Where the exception report is the result of a minor error,
the EHU will arrange for the corrected voucher information to be
re-processed and posted to the CIS system records.
(This text has been withheld because of exemptions in the
Freedom of Information Act 2000)
The EHU does not refer exception reports directly to the Network
Office owning the subcontractor or contractor's SA or CTSA record.
In some instances, however, the local recovery section or the CIU
may refer the case to the subcontractor or contractor's Processing
Office to pursue. When this happens the Processing Office becomes
responsible for resolving the exception.