Construction Industry Scheme - CIS8600
Scheme compliance: contractors: introduction
| CIS0040 | Back to 'Scheme compliance' contents
|
| CIS8601 | Information menu
|
| CIS8602 | Action guides
|
INTRODUCTION
This paragraph serves as an introductory overview of the module
on contractor compliance under the Construction Industry Scheme.
For more detailed coverage use the above links to the information
menu or action guide menu.
This module deals with the failure of contractors to fulfil
obligations placed on them by the Construction Industry Scheme and
any action required of Network Offices relating to such failures.
Compliance breaches by contractors generally involve errors
of omission or commission, that is, s/he has failed to do something
which they should have done under CIS or something that they do
represents an irregularity under CIS.
There are action guides involving failures of contractors
to
- inspect certificates
- inspect Registration Cards
- obtain or submit CIS24 vouchers
- submit vouchers generally
- issue CIS25 vouchers to registered subcontractors
- submit CIS36 returns
- requests from subcontractors for more vouchers
In addition, there are action guides dealing with certain voucher exception reports which may reach Network Offices involving the irregular use of CIS documents.
IMPORTANT NOTE FOR NETWORK OFFICES RECEIVING VOUCHERS OR CHEQUES
Remember that vouchers should normally be returned by
contractors to the CIS Centre and not to Network offices. This
includes RLS vouchers and spoilt vouchers (returned with form
CIS52). Where it becomes apparent that this is occurring on a
regular basis you should consider contacting the contractor to
remind him/her of the correct procedure and to point out that this
may result in delays in the issue of voucher stocks to him/her and
to their subcontractors.
Where you receive RLS vouchers (CIS23 & CIS25) in a
Network office you may re-issue them if the address on the CIS
system has been updated since the vouchers were issued. Where
spoilt vouchers are returned for cancellation you should refer to
CIS6319 for the action to be taken. Where completed vouchers are
received you must send them immediately to the CIS Centre. This is
because any delay will hinder both the processing of those vouchers
and the replenishment of stocks to the contractor or subcontractor.
Where cheques are received you should follow the usual
procedures and send them to the relevant Accounts Office on the day
of receipt.
PENALTIES
In all cases where penalties are an issue you should consider
whether the failure is substantial enough to warrant a penalty
under TMA70\s98(1)(b), or TMA70\s98(2) or whether to consider the
non-compliance when reviewing the filer's next certificate
application. If you consider that a penalty is justified you should
refer the case to BS(CIS) before taking further action.