Conditions B, C and D in
BLM23030 are treated as met where they
are not met only because
The ‘principal parties’ are the lessor's side, the
lessee's side and the contractor under the main contract for the
construction of the plant or machinery.
An example of an event that might be both unforeseen and
beyond the control of the parties is a strike or the sinking of a
ship carrying materials to be used in the construction of the asset
delaying construction.
Such events are also unlikely to be able to have been avoided
by any of the principal parties.
Cases of doubt or difficulty should be referred to CT &
VAT (Technical) after having obtained any relevant explanations and
documents.